me + construction

me×!construction×

showing 2000 only · show all years
me + construction
The Construction-Themed Holiday Shot. (At this point, we'd been renovating our loft space for the last 6 months and one of these seemed appropos.) Dzija with googles and expanding foam insullation, Amy with extension cord, Barlow with dry-wall gun and helmet, me with cordless impact nail gun.
me + construction
me + construction
Scraping left us covered in dust and muck. After Amy helped vacuum off my arms...
me + construction
BONEHEAD MISTAKE #2: In order to fit two levels inside, we needed to make the first floor ceiling's shorter than code...which meant we'd need to trim about 8" off of all of the pre-fab door we bought. I took my door off the hinges, measured it and cut it, only to realize that measure from the wrong side. So when I re-hung the door it looked like this.
me + construction
Barlow taking a picture of me in my room from his room.
me + construction
Peekaboo!
me + construction
First person on the second floor! First person on the second floor!
me + construction
With the framing of my room complete, I cut out the floor plate so that I can hang my door.
me + construction
The gang hanging from the first joist-header we put in (in my room).
me + construction
Dzija and I building the ceiling of Barlow's room (which will also eventually become the floor in Dzija's bedroom).